Broward County Seawall Requirements
Broward County seawall requirements set 5 feet NAVD88 as the lowest a new or substantially repaired wall can sit. It isn't a deadline for every wall on your canal.
Get a free match with a licensed contractor
Call or text (754) 283-8092
Call now or send a text with your address and what you need.
The county code, word for word
Section 39-407 is what people mean when they say "the seawall rule."
Sec. 39-407. - Minimum elevations for coastal infrastructure within tidally influenced areas.
(a) All new or substantially repaired or substantially rehabilitated banks, berms, green-grey infrastructure, seawalls, seawall caps, upland stem walls, or other similar infrastructure shall be designed and constructed to perform as tidal flood barriers. Tidal flood barriers shall have a minimum elevation of five (5) feet NAVD88. Applications for new or substantially repaired or substantially rehabilitated tidal flood barriers submitted prior to January 1, 2035, may be permitted a minimum elevation of four (4) feet NAVD88, if designed and constructed to accommodate a minimum elevation of five (5) feet NAVD88 by January 1, 2050.
(b) All property owners must maintain a tidal flood barrier in good repair. A tidal flood barrier is presumed to be in disrepair if it allows tidal waters to flow unimpeded through or over the barrier and onto adjacent property or public right-of-way. Failure to maintain a tidal flood barrier in good repair shall be a citable offense. The owner of the tidal flood barrier shall demonstrate progress towards repairing the cited defect within sixty (60) days after receiving a citation and shall complete repairs within three hundred sixty-five (365) days after receipt of the citation. If the required repair or rehabilitation meets the substantial repair or substantial rehabilitation threshold, no later than three hundred sixty-five (365) days after receipt of the citation, the property owner shall design, obtain permits, cause to be constructed, and obtain final inspection approval of seawall improvements that meet the minimum elevation and design requirements.
(c) Tidal flood barriers below a minimum five (5) feet NAVD88 elevation shall be improved, designed, and constructed so as to prevent tidal waters from impacting adjacent property or public right-of-way. Causing, suffering, or allowing the trespass of tidal waters onto adjacent property or public right-of-way is hereby declared a public nuisance and a citable offense requiring abatement. The owner shall demonstrate progress toward addressing the cited concern within sixty (60) days after receipt of the citation and complete the construction of an approved remedy no later than three hundred sixty-five (365) days after receipt of the citation.
(d) Tidal flood barriers shall be designed and constructed to prevent tidal waters from flowing through the barrier, while still allowing for the release of upland hydrostatic pressure.
(e) To the extent practicable, tidal flood barriers shall be designed and constructed to adjoin immediately proximate tidal flood barriers to close gaps and prevent trespass of tidal water.
(f) All tidal flood barriers undergoing substantial repair or substantial rehabilitation shall be constructed along the property's entire shoreline.
(g) All tidal flood barriers shall be constructed with natural limerock rip-rap, or other approved habitat enhancement, at the waterward face of the structure.
(h) Property owners are encouraged to consider approaches and materials that enhance the biological value of traditional (flat surface) seawalls and flood barriers with the incorporation of living shoreline features, use of hybrid green-grey materials, and the use of biological forms, where practicable.
(i) This section shall not be construed to require the installation of a seawall where other flood protection measures serve as an equally effective tidal flood barrier.
(j) Tidal flood barriers capable of automatically being elevated in advance of high tides to prevent tidal flooding are permissible, provided that automation cannot require daily human intervention.
(Ord. No. 2020-11, § 1, 3-31-20)
Broward County Code, Ch. 39, Art. XXV (Ord. No. 2020-11), Municode. Source, pulled Nov. 21, 2026.
So do I have to raise my wall?
Not just because the rule exists. Read (a) again. The dates are about applications: January 1, 2035 ends the 4 foot option, and 2050 is when a wall permitted at 4 feet has to be able to reach 5. Nothing there sets a date for a wall nobody is working on.
Work pulls a wall in. So does a citation under (b) or (c). Here's how substantial repair and citations work.
Who it covers
Sec. 39-405. - Applicability.
This article applies to all new tidal flood barriers, substantial repair or substantial rehabilitation to shorelines and shoreline structures, and the installation of any fixed infrastructure attached to tidal flood barriers (such as mooring structures). This article is not applicable to oceanfront beaches or shorelines seaward of the Coastal Construction Control Line.
(Ord. No. 2020-11, § 1, 3-31-20)
Broward County Code, Ch. 39, Art. XXV (Ord. No. 2020-11), Municode. Source, pulled Nov. 21, 2026.
Each tidal city had until February 13, 2022 to pass its own version. Fort Lauderdale's adds a 6 foot ceiling. Pompano Beach has no 4 foot option, which is on the Hollywood and Pompano Beach page.