Fort Lauderdale Seawall Requirements
Fort Lauderdale seawall requirements live in ULDR Sec. 47-19.13, which Ordinance C-23-05 added on March 23, 2023. The floor is 5 feet NAVD88. Unlike the county model, the city sets a ceiling as well.
Get your wall checked by a licensed contractor
The height rule
Sec. 47-19.13. - Resiliency standards for tidal flood protection.
D. Standards for shoreline structures.
1. All new or substantially repaired or substantially rehabilitated shoreline structures shall be designed and constructed to perform as tidal flood barriers. Tidal flood barriers shall have a minimum top elevation of five (5) feet NAVD88, except as provided herein. Applications for new or substantially repaired or substantially rehabilitated tidal flood barriers submitted prior to January 1, 2035, may be permitted at a minimum top elevation of four (4) feet NAVD88, provided that the tidal flood barrier is designed to accommodate a minimum elevation of five (5) feet NAVD88, by January 1, 2050.
12. The top elevation of a new or modified tidal flood barrier shall not exceed the base flood elevation (BFE) as identified in the FEMA Flood Insurance Rate Map (FIRM) or six (6) feet NAVD88, whichever is lower. For properties within an X zone, the maximum tidal flood barrier elevation shall not exceed the natural elevation of the ground, as defined in subsection 47-2.2 (g)(1)(a); however, in the event of a conflict between Section 47-19.13.D.(1) of the ULDR and this sub-section, the requirements in Section 47-19.13.D.(1) of the ULDR shall govern.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
So the top has to land between 5 feet and the lower of your base flood elevation or 6 feet. Filing before January 1, 2035? 4 feet is still possible if the wall can reach 5 by 2050. Check your flood zone before anyone forms a new cap.
The 50 percent line
Sec. 47-19.13. - Resiliency standards for tidal flood protection.
12. Substantial repair or substantial rehabilitation means:
a. Any modification to the shoreline or a shoreline structure along more than fifty (50) percent of the length of the property's shoreline; or
b. Any modification, or alteration of an existing shoreline structure, that exceeds fifty (50) percent of the fair market replacement cost of the existing shoreline structure.
c. Strictly for purposes of defining "substantial repair" and "substantial rehabilitation," the term "shoreline structure" excludes docks, finger piers, piles and ancillary concrete footers but shall include concrete docks that are poured monolithically with the seawall cap.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
Notice what's left out. Docks, finger piers and piles don't count, unless the dock is concrete poured in one piece with the cap.
Houses that sit low
Some older homes have a living floor below 4 feet NAVD88. Here the City Engineer weighs whether a full-height wall would flood the living space.
Sec. 47-19.13. - Resiliency standards for tidal flood protection.
The city engineer may grant a waiver to waterfront properties containing a principal structure with a habitable finished floor elevation of less than four (4.0) feet NAVD88 for the construction of a tidal flood barrier with an elevation less than the minimum top elevation required in Section 47-19.13.D(1). The city engineer shall consider the potential for flooding of the habitable space as a result of the installation of the tidal flood barrier at the minimum top elevation and the prevailing maximum tidal elevations at the time of application. The waiver may be granted for a term not to exceed three (3) years. Waivers granted pursuant to this subsection shall become void either upon the expiration of the waiver's term or upon the transfer of the ownership of the property for which the waiver is granted, whichever occurs first. The city engineer may rescind a waiver or decline to grant an extension to the waiver in the event that the tidal barrier subject of the waiver was overtopped by tidal waters, failed to perform as a tidal flood barrier or if prevailing environmental conditions no longer support granting of the waiver. City engineer shall provide fifteen (15) days' notice of such revocation.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
A waiver doesn't survive a sale.
When the city cites a wall
Sec. 47-19.13. - Resiliency standards for tidal flood protection.
2. All property owners shall maintain a tidal flood barrier in good repair. A tidal flood barrier is presumed to be in disrepair if it allows tidal waters to flow unimpeded through the barrier and onto adjacent property or public right-of-way. Failure to maintain a tidal flood barrier in good repair shall be a citable offense. The owner of the tidal flood barrier shall demonstrate progress towards repairing the cited defect within sixty (60) days after receiving a citation and shall complete repairs within three hundred sixty-five (365) days after receipt of the citation. If the required repair or rehabilitation meets the substantial repair or substantial rehabilitation threshold, no later than three hundred sixty-five (365) days after receipt of the citation, the property owner shall design, obtain permits, cause to be constructed, and obtain final inspection approval of seawall improvements that meet the minimum elevation and design requirements.
3. Shoreline structures that do not prevent tidal waters from entering adjacent property or the public rights-of-way shall be improved, designed, and constructed to function as tidal flood barriers. Causing or allowing the trespass of tidal waters onto adjacent property or the public rights-of-way is hereby declared a public nuisance and a citable offense requiring abatement; however, existing tidal flood barriers that have been designed and constructed in accordance with the provisions of this section that are overtopped by tidal water shall not be considered a public nuisance or citable offense. Upon receipt of a citation, the owner shall demonstrate progress toward addressing the cited concern within sixty (60) days after receipt of the citation and complete the construction of an approved remedy no later than three hundred sixty-five (365) days after receipt of the citation.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
Look at the carve-out in item 3. A wall built to this section isn't a nuisance just because a big tide goes over it.
Before a contractor comes out
Do you know your current cap height? If you have a recent survey, look for it there. Keep any letter from the city handy too. The county-wide picture is on the Broward County seawall requirements page.